neděle 30. dubna 2017

Wood on the water


The moment of truth. She is beautiful, fast and amazing. Exactly 3,5 years after it all started with plans on 1.11.2013. Rewarding project completed without previous skills or experience with such a project, with hobby tools that fit in one shelf. Now we will go on with registration with authorities and some minor stuff (bumper rail, windshield, motor cover).

pátek 28. dubna 2017

Boat hotel


As soon as the boat recieved an upholstery my doughter raid it with a sleeping bag. That is love.

Windshield


Safety glass, but nevertheless, it will be covered with safety film to keep it from breaking.

pátek 21. dubna 2017

Wiring completed

Original dashboard supplied with the engine did not have enough gauges, so some more were ordered and put into a small wooden box with LEDs and switches. Oil pressure, cooling water temperature, engine hours, battery level, fuel level. Switches are for deck lights and ilumination of gauges, amplifier and a push button for horn.

pondělí 17. dubna 2017

Wiring

4 days of work to complete hydraulic steering, floors, most of the electric wiring and dashboard.

sobota 15. dubna 2017

Hide-out

Great place to finish a book when the cleaning is done.



Wiring and cleaning

Drilling into the dashboard needs some cleaning. Dashboard from mahogany with dials from Wema is test fitted. Large hole on the left shall receive the hydraulic pump for steering. 

pátek 7. dubna 2017

Signes and names




The name is painted with golden paint in between the varnish layers. Front deck has an inlay of ash and mahogany made by a friend.