Side panels fully completed yesterday. I have built easy plywood bending jig to pre-bend the aft part of the panels to allow easier fit on the frames, chines and sheer logs. So the most complicated structural work is behind me. Each side consumed 300g of Epoxy.
The next step is to glue mahog planks on the transom, finish the bottom pannels and start fiberglassing.
pondělí 29. prosince 2014
1. year aniversary
Its been a year since this project started. The total hours would be an equivalent of 1,5 working month. In fact most of the work has been done during 4 weeks full time and the rest is minutes and hours here and there... So about 200 manhours.
pondělí 8. prosince 2014
Front side panels
After tedious fairing and repairing some fairing mistakes, front side panels glued in place. Side panels are from two pieces butt-joined at the aft section.
pondělí 17. listopadu 2014
Some serious Fairing after 3 month break
Some fairing issues solved. I must admit that every word in the 5 pages manual is worth. It is amazing how simple yet detailed process description can be written. Front side panels cut to size, dry fitted and some more fairing identified. But overall good progress achieved over the weekend. I believe I am 2 working days before the planking starts.
neděle 24. srpna 2014
Inspiration
Inspiration taken in Venice, Italy. The project is due to lack of time on a standstill until winter. I also need to think on how to proceed with fairing.
Přihlásit se k odběru:
Příspěvky (Atom)