Inspiration taken in Venice, Italy. The project is due to lack of time on a standstill until winter. I also need to think on how to proceed with fairing.
neděle 24. srpna 2014
čtvrtek 24. července 2014
úterý 22. července 2014
First pair of chines mounted
Chines are almost done except some small part, sheers to go next - without the steambox it is not possible.
neděle 29. června 2014
Steambox
Latest development on the boat is a steambox. I had to stop the work on the boat until this piece of hardware would help me to bend the sheers and chines along the boat. It is simple plywood box with 10cm inner copper tube and insulation around it. Steam is introduced from the other side (teapot with boiling water on a small stove). To heat up the pieces takes more than 1 hour.
pátek 13. června 2014
Battens and chines glued
not according to the original plan of assembly but... the plan now is to make a steam box to provide for easier and safer sheer and chine bending around the hull.
Přihlásit se k odběru:
Příspěvky (Atom)


