pondělí 30. prosince 2013
Frame No 4
Assembled and glued, just without the mahogany dashboard, which will come later. At this point I also need to order mahogany for keel, chines, sheers, batens and motor stringers. I will also order pine for the building form. Each panel 100g of epoxy.
čtvrtek 26. prosince 2013
Frame No 1
Assembled and glued today. Even it was not the first one nor the most complex one, it took me a lot of time to do this one. The next is to get ready for F4 with the mahogany dashboard.
středa 25. prosince 2013
Transom
So the transom is assembled and glued. It will dry over night and than just to cut off the excess plywood and fair to final shape. I have forgot to cut out the notches for the keel and battens, so I will have to do it with router later.. Edit: you can see a plywood piece at the back of the frame. This is acutally not needed if you plan later to plank it from the back.
The best tool that is helping me is Narex steel plane. The project is very easy on tools I have very few professional tools. And as you work with epoxy, you need to be quick. The progress is very motivating.
![]() |
| Narex steel plane. Similar to Stanley, but local and cheaper. |
pondělí 23. prosince 2013
Frame No 5
Yesterday assembled and glued. Epoxy 1200 is king. Today I have faired off excess plywood gussets from Frame No 5 and 3. The next in the row is Transom. Gussets shall be next time from wood in design places (typically cockpit frame). The same goes for the sides and dashboard.
sobota 21. prosince 2013
Frame No 3
Vacation. Finally. Frame no 3 assembled with 3 kids. Who says that boats can not be built with them :-)? The plan is to do one frame a day during the Xmas time. It is not much, but when you cook, play with kids and do everything else, it is OK. CHS Epoxy 1200, 70g/frame.
I have also tested the okoume plywood by boiling a piece in water for 1 hour. And both the wood and the glue survived. It is just exterior B class, which I intend to use only on the inside parts of the boat: gussets, bulkheads etc. But also outside planking if I do not get marine AA in the lumberyard.
![]() |
| It takes 4 people to assemble Frame No3 :-) The youngest is <2 y.o. and helps driving screws! |
| Plywood after 1 hour in boiling water |
Přihlásit se k odběru:
Příspěvky (Atom)




