neděle 21. srpna 2016

Deck sanded and primed

150 g Epoxy primer Sea-line for one layer (2 layers with in-between sanding). This closes the grain and the risk being stained by white filler is reduced.

neděle 14. srpna 2016

Back side deck planked


Good result to close the gap between planks is to hammer it in softly having the wedge like shape.

pátek 12. srpna 2016

Floors and seats varnished


This was a lot of varnishing. The total surface (both sides) were more than the boat itself. Used cheaper polyurethane varnish.